The Development & Installation sector of a solar panel service involves the planning, design, and physical setup of a solar energy system

Site Evaluation

A comprehensive assessment of the property will be conducted to determine its suitability for solar panel installation.

Factors such as solar irradiance, roof orientation, structural integrity, and potential obstructions will be carefully evaluated using advanced tools and techniques.

Detailed data, including local regulations, grid connection requirements, and historical weather patterns, will be gathered to inform the design and installation process.

System Design

A customized solar energy system will be designed to meet the specific energy needs of the customer, while considering factors such as energy consumption patterns, budget constraints, and local conditions.

Advanced software tools will be used to optimize system performance and cost-effectiveness.

Suitable solar panels, inverters, batteries (if applicable), and other components will be selected based on the system’s requirements, taking into account factors such as efficiency, durability, and warranty coverage.

Permit Acquisition

Necessary permits and approvals will be obtained from local authorities to ensure compliance with building codes and regulations.

The permitting process will be managed efficiently to minimize delays and ensure timely project completion.

We will work closely with local officials to address any concerns or questions they may have.

 

img3
industrial project
img99
 
Installation

The installation of the solar energy system will be carried out by experienced technicians who are certified to meet industry standards.

The site will be prepared, and the equipment will be securely mounted on the roof or ground using high-quality materials and techniques.

Electrical connections will be made with precision, and the system will be thoroughly tested to ensure proper functionality and safety.

Grid Connection (if applicable)

If applicable, the solar energy system will be connected to the electrical grid to enable the sale of excess energy back to the utility company.

Net metering arrangements will be established to offset energy costs with the energy produced.

We will coordinate with the utility company to ensure a smooth and efficient grid connection process.

Ongoing Monitoring and Maintenance

Regular monitoring and maintenance will be conducted to ensure optimal system performance and longevity.

Advanced monitoring systems will be used to track system performance, identify any issues or inefficiencies, and optimize system operation.

Routine maintenance tasks, such as cleaning solar panels, inspecting components, and updating software, will be performed to maintain system efficiency and reliability.

We offer comprehensive maintenance plans that include regular inspections, cleaning, and troubleshooting to ensure your system operates at peak performance.

Permission and Procedures for installation On-Grid or Grid tie solar project

  • For On Grid Installations, we need to get permission from the Local Grid(KSEB/BESCOM) as we are feeding power to the Grid.
  • Solar Feasibility is the basic step which we need to do for on grid installation. We will be approaching KSEB / concerned utility dept and giving an application for solar feasibility. For which they will give the report within 7 days of application.
  • After we receive the feasibility report from the concerned utility dept, we need to undergo a registration process. We will have to upload to give details regarding the project, products, make, type of roof, period expected to complete the installation, etc. Also will have to make a security deposit depending on the kW of installation.
  • On completing the registration process we can do installation.
  • Utility Grid inspection, after completing the installation grid utility dept will be making site inspections. Checking all the safety parameters of the project. Once we pass the inspection, they will allow net metering for the project.
  • In the net-metering process, grid authorities will be coming and changing the existing energy meter with a bidirectional energy meter.

It’s important to note that the specific steps and procedures may vary depending on local regulations, system size, and other factors. Consulting with a qualified solar installer is recommended to ensure a successful development and installation process.